What We Do

datacenter
Acceptance and Maintenance

Acceptance and Maintenance Testing

  • MV and LV Circuit Breaker Testing
  • Ground Fault Testing
  • Transformer Testing
  • Infrared Surveys
  • Cable Testing
  • Grounding System Testing
  • Switchgear Maintenance and Testing
  • PLC Controlled Switchgear Maintenance and Repair
  • Power Meter Install and Integration

NFPA 99 Testing

  • Isolation Panel Testing
  • Patient Vicinity Ground Testing
  • Outlet Integrity and Retention Verification

Did You Know?

Did you know that PHe Services has performed startup and commission on as much as 30 megawatts of switchgear on a fast paced project?

Did you know that the NFPA 70B outlines the Recommended Practice for Electrical Equipment Maintenance?

Did you know that per NFPA 70B 4.2.1 "A well administered electrical preventive maintenance program reduces accidents, saves lives, and minimizes costly breakdowns and unplanned shutdowns of production equipment"?

Custom Bussing, Breaker Retrofits/Upgrades

  • Equipment Replacement
  • Switchgear Extensions and Additions
  • Upgrade Obsolete Switches and Breakers

Power System Studies

  • Arc Flash Hazard Analysis
  • Coordination Studies
  • Short Circuit Studies
  • Power Quality Studies and Analysis
  • 30 Day Load Studies

24/7 Emergency Services

  • Emergency Switch or Breaker Replacement
  • Emergency Switchgear Repair or Replacement

;